Project overview
What we deliveredfor Skyline Developers.
Phase 2 of Skyline Corporate Park covers twin office towers and a shared podium. Our scope runs from HT intake and transformer rooms through LV distribution, lighting control, ELV pathways, and statutory approvals with Torrent Power — delivered by one site team so consultants and fit-outs stay coordinated.
- HT / MV intake & transformer rooms
- LV main & sub distribution
- Lighting & emergency systems
- ELV pathways & containment
- Torrent licensing support
Products used
Equipment and materials on this site.
Key products specified and installed — switchgear, lighting, life safety, and cabling.
HT switchgear
11kV VCB panel
Schneider Electric
Primary intake switchgear for campus HT room with metering integration.
Power
Dry-type transformers
ABB
Floor-wise step-down units sized for peak office and podium loads.
LV distribution
Main LT panel & APFC
Legrand
Main distribution with power-factor correction for commercial towers.
Lighting
LED luminaire suite
Philips / Wipro
Office, lobby, and façade fixtures with emergency battery packs.
Containment
Cable management
OBO / local GI
Ladder trays and raceways for power and ELV separation on risers.
Protection
MCCBs & MCBs
Schneider Electric
Floor DB protection coordinated with upstream LT settings.
Site images
From the ground.
Photography from delivery — panels, spaces, and site context.





Planning a similar site?
Tell us the load, timeline, and constraints. We'll come back with scope, product options, and delivery sequence.